House rewiring in Harrow
We rewire houses and flats in Harrow and the neighbouring towns, from a single floor or a kitchen to the whole property. A rewire replaces the cables, back boxes, sockets, switches and usually the consumer unit, so the installation meets current wiring rules and can carry the loads a modern home puts on it.
- Full or partial
- Planned room by room
- Certified and notified
When a rewire is the right answer
Electrical Safety First says there is no set age at which a house needs rewiring: old wiring is not automatically unsafe, and condition matters more than age. The warning signs it lists are heat marks on plugs or sockets, buzzing or crackling from the wiring, and fuses that blow or breakers that trip. An EICR adds the hard evidence: low insulation resistance across several circuits, rubber-insulated or fabric-covered cable, or C2 observations spread through the house rather than in one place.
Old cable types
The IET notes that rubber-insulated cable was in general use until the early 1950s, when plastic-insulated cable took over. Rubber insulation is now usually hardened and brittle, and some older cable of this kind may contain asbestos, which needs handling with care. Some PVC cable from 1968 to 1975 has also been found to degrade, leaving a sticky green residue at terminals. Either way, the cable cannot be repaired back to health; it has to be replaced.
Full or partial?
A partial rewire replaces the circuits that are failing and keeps the ones that test well, such as an extension wired in the last decade. It costs less and disrupts less. An EICR before the quote tells us which circuits are sound, so you pay only for what needs replacing.
What happens during a rewire
The first fix is the disruptive part: floorboards lifted, channels cut into walls, new cables run and new back boxes set. Walls are then made good by a plasterer. The second fix brings the sockets, switches and fittings, the new consumer unit, and full testing. New circuits are notifiable under Part P, so the work is registered with building control and you receive an Electrical Installation Certificate. An empty house is quickest, but many rewires are done with people living in, working room by room.
Planning what you want
A rewire is the cheapest moment to add what you will want later: more sockets where furniture actually sits, outdoor sockets, a supply ready for an EV charger, network cabling, and mains-wired, interlinked smoke and heat alarms. Settle the kitchen layout first, because it decides where the most circuits go.
What affects the price
Size is the start, but floors matter too: suspended timber floors are quicker to run cable under than solid ones. Whether the house is empty, how many points you want, the consumer unit, and how much making good is included all change the figure. We give a timetable with the quote.
Common questions
How long does a rewire take?
It depends on the size of the home and whether it is empty. You get a timetable for your property with the quote.
Can I live in the house during a rewire?
Often, yes, if the work goes room by room and some power is restored each evening. An empty house is quicker and cleaner.
Is a rewire notifiable?
Yes. New circuits are notifiable under Part P in England. As an NICEIC Domestic Installer we register the work with building control ourselves, and you receive the certificates.
Sources
Get a price
Ring us, or leave your number and we will call back with a price.
- Postcode and property type
- Number of bedrooms
- Any outbuildings or a second board
- Your deadline, if you have one
House rewiring across north-west London
We provide house rewiring in Harrow and the neighbouring towns. Choose yours for local licensing and housing notes.
Useful reading
Does your house need rewiring? Signs to look for
Warning signs, old cable types and when to test.
EICR codes explained: C1, C2, C3 and FI
What each code means and which ones fail a report.
What an EICR costs, and why quotes differ
What sets the price and how to compare quotes fairly.
Other services in this group
EICR remedial work
Fixing C1, C2 and FI items so the report can be closed off.
Consumer unit replacement
Old fuse boxes swapped for a metal board with RCD protection.
Smoke and heat alarms
Mains-wired, interlinked alarms for lets and family homes.
Also from Harrow EICR
Landlord EICRs
The five-yearly inspection every private let in England needs.
Home electrical inspections
For homes you own, are buying or are about to renovate.
HMO and commercial EICRs
Shared houses, flats above shops and small business premises.
PAT testing
Appliance checks for furnished lets, HMOs and workplaces.
Get a price
Leave your number and we will ring back with a price and the next available times. Or ring 020 8194 2001.